Hardcraft

Approach

From first call to a stable environment

Four steps. After each one you know what was done, what it cost and what is still open.

  1. Intake

    We go through what runs, what goes wrong and what is coming up. No obligation, usually half an hour. Nothing to prepare in advance.

  2. Audit

    I map your environment: versions, updates, backups, access rights, monitoring and the risk points. You get a report ordered by urgency — even if you take it elsewhere afterwards.

  3. Implementation

    Work in agreed blocks, with a rollback plan per step. Anything that carries risk is scheduled outside office hours. You know up front what changes and when.

  4. Ongoing management

    Monitoring, updates, backup checks and restore tests. A short periodic report: what happened, what stood out and what needs attention.

Ground rules

What you can hold me to

  • No change without a rollback plan.
  • A backup only counts once the restore has been tested.
  • Everything I configure is documented inside your own environment.
  • You keep the keys. Always handover-ready for a successor.
  • Materials and hours are traceable — you can see where everything went.

Is your infrastructure running the way it should?

Half an hour on the phone costs nothing and usually surfaces a few concrete improvements already.

Get in touch